Description
BO-51877 includes 25 markers are used to position aluminum body repair panels during body repair. As many markers as are needed are threaded into the aluminum structure panel, and the new outer body panel is placed over the structure and markers. The new panel is pressed into position over the markers, which mark the required areas to drill in order to attach the new panel to the structure with rivets.
Warranty
Consumable, no warranty